Contract for MSE 2094
Evaluation Group
Kevin Cherry
The evaluation group having been established to provide
evaluation support for the Analytical Methods in Materials Engineering
Class final project does hereforth enumerate the rights and responsibilities
of said group.
- This group shall help to set design objectives and guidelines
- To accomplish this we shall use Total Quality Management,
to ensure the proper operation of the groups, and to guarantee
that the project is accomplished.
- And we will provide assistance as nessiciary to ensure this
- We shall proofread all documents proposed to the project and
ensure that they meet our very high quality objectives.
- We will review the webpage as it progress, and design an evaluation
method for our interface. We will utilize various persons and
resources spread throughout this university to accomplish this.
- But we will also require that some review be given by members,
of the group that produced the web page, we cannot be expected
to catch every mistake because we will not be experts on every
single fact.
- We will strive to make sure that this webpage is as publicized
as possible. Making sure that all faculty are made aware of it,
and that other schools are notified of its existance to allow
for communication, around the country and maybe even around the
globe.
- We will as part of our evaluation attempt to solicit faculty
input, and we will survey them on the proposed content of the
page.
- We will attempt to act as the go-between for the HTML group
allowing us to save some of their time by correcting and clarifying
things before they encode them.
- We will try to act as mediators and resolvers of group conflict,
striving to keep things flowing as to allow thing to get done,
so that the final evaluation can be made.
- Seeing as how communication is a key part to any evaluation,
and even more critical for a team project, we will endeavor to
set up a MSE 2094 newsgroup, that will allow us to break down
the barrier of normal communication, and allow freer , and more
open discussion throughout the group.
- Of critical importance, this project MUST be completed
AT LEAST ONE week prior to Final exams. If this
is not met the evaluation group will NOT have the time to complete
its evauation in a quality manner, and will be forced to settle
for a less than satisfactory examination, of our final product.
- We will also produce a final report that will detail all
concerns and suggestions made during this process. We may also
seek some kind of internal evaluation of the entire project, by
surveying the class or something.
Having set forth these things on the 27th of February AD 1997
I the party of the first part agree, to provide the party of the
second part(Dr. RD Kriz, and class) all of these services, and
to allow them to be changed with consent, of both parties.
Kevin Cherry
Last modified March 17, 1997.
URL: http://www.vt.edu:10021/K/kecherry/contract.html